Russian Biological Protein Feeding Technology Improvement Project

<مرحلة التخطيط>

2026-08-19 16:30:17

0

0

0

A Russian company plans to carry out technical upgrades to its bio-protein feed production facility, with the aim of improving protein conversion rates, reducing energy consumption and production costs, and improving product quality stability. At present, the two parties are in the stage of cooperation negotiations, and the owner hopes to introduce advanced technologies and equipment in the fermentation, separation, or drying stages, and carry out partial or systematic upgrades to the existing production line. Engineering companies and technology providers with technical achievements in the fields of bio-fermentation and feed protein are welcome to interface, and can provide services such as on-site diagnosis, technology upgrade plan design, key equipment selection and commissioning guidance, to jointly explore the path of technological cooperation and implementation of the upgrade.

تصنيع المواد الكيميائية الدقيقة

روسيا

S - تحديث وتطوير المنشآت

ساري إلى أجل غير مسمى

Demand for a 90,000-ton/year synthetic ammonia project in Korea

<مرحلة المناقصة>

2026-08-19 16:30:03

0

0

0

A Korean owner is planning to build a 90,000-ton/year ammonia synthesis plant and is currently seeking technical solutions and quotations. The project is of moderate scale, and the owner focuses on the economic viability of the raw material route, the energy efficiency level of the plant, the stability of low-load operation, and the environmental and safety compliance requirements in Korea. Design institutes and technology providers with engineering experience in medium- and small-scale ammonia synthesis plants are welcome to engage in technical exchanges, such as process route selection, basic design, and energy efficiency optimization solutions. Suppliers of key equipment such as ammonia towers and compressor units, as well as suppliers of catalysts, are also welcome to participate in the preliminary technical exchanges.

تصنيع المواد الكيميائية الأساسية

الأسمدة الكيميائية والكيماويات الزراعية

أخرى

T - خدمات التكنولوجيا وبراءات الاختراع

E - خدمات التصميم الهندسي

ساري إلى أجل غير مسمى

Requirements for the Korean baking soda production facility project

<مرحلة المناقصة>

2026-08-19 16:29:49

0

0

0

A Korean chemical company plans to build a soda ash production facility, targeting the food, pharmaceutical, and industrial-grade sodium bicarbonate markets. The project is of moderate scale, but it requires strict control over product purity, whiteness, and particle size distribution, as well as high levels of automation. The client is currently in the process of selecting a technical solution and requesting quotes. Service providers with experience in the design of soda ash and caustic soda refining facilities, as well as advanced technology for sodium bicarbonate processing, are welcome to connect with the client to provide services such as process solutions, engineering design, key equipment supply, and automation control. This is an opportunity to explore long-term cooperation in the high-end markets of East Asia.

تصنيع المواد الكيميائية الأساسية

تصنيع المواد الكيميائية الدقيقة

أخرى

E - خدمات التصميم الهندسي

ساري إلى أجل غير مسمى

Construction Project of the UAE Oil Storage Area

<مرحلة التخطيط>

2026-08-19 16:29:35

0

0

0

The UAE energy company has planned a project to build a petroleum storage area to enhance the storage and transit capacity of crude oil and refined products, and to support the layout of a regional energy trading hub. The project is currently on hold, pending the maturity of the investment plan and market conditions. When the project resumes, the owner will need overall design of the storage area, supply and installation services for storage tanks and associated pipelines. Engineering companies with large-scale oil storage facilities, EPC or design experience in storage areas are welcome to continue to monitor the situation and prepare their plans in advance. Also, large-scale storage tank manufacturers, anti-corrosion and insulation companies, and automated instrumentation companies for storage areas are welcome to stay in touch and prepare for the tender when the project resumes.

البتروكيماويات والكيمياء الحرارية للفحم

معدات التخزين والنقل ونظام منطقة الخزانات

الإمارات العربية المتحدة

E - خدمات التصميم الهندسي

C - خدمات الإنشاء والتركيب

ساري إلى أجل غير مسمى

Demand for the ammonium chloride-co-produced calcium chloride project in Oman

<مرحلة المناقصة>

2026-08-19 16:29:20

0

0

0

The owner of the project in Oman is planning to produce 200,000 tons of soda ash annually and produce 200,000 tons of calcium chloride by utilizing the by-product wastewater from the ammonia-alkali process. Once the financing plan is implemented, the project is expected to accelerate. The owner is interested in the integrated design of the soda ash and calcium chloride units, the waste liquid concentration crystallization process, and the overall investment economics. Design institutes with experience in the design of ammonia-alkali soda ash and calcium chloride plants are welcome to contact us to provide process solutions and investment estimates. Suppliers of evaporation concentration and granulation drying equipment, as well as engineering companies that can participate in the financing arrangement, are also welcome to contact us.

تصنيع المواد الكيميائية الأساسية

الكلور-قلوي وصناعة الأملاح الكيميائية

عمان

E - خدمات التصميم الهندسي

ساري إلى أجل غير مسمى

Afghanistan 1,200 tons/day refinery project demand

<مرحلة المناقصة>

2026-08-19 16:29:05

0

0

0

The Afghan owner is promoting a daily processing project of 1,200 tons of refined oil, with Chinese engineering companies participating in the overall contracting. The project involves the entire process of crude oil processing, and the owner is concerned about the adaptability of raw materials, the reliability of simplified equipment, and the feasibility of implementation under local construction conditions. Engineering companies and design institutes with experience in designing small and medium-sized refineries are welcome to participate in the project, providing overall design, process packages, and project management support. Suppliers of key refining equipment such as heaters, towers, and heat exchangers are also welcome to participate in the bidding, exploring subcontracting or joint implementation models.

البتروكيماويات والكيمياء الحرارية للفحم

التنفيذ الكامل والمقاولة العامة وإدارة المشاريع

أخرى

E - خدمات التصميم الهندسي

C - خدمات الإنشاء والتركيب

ساري إلى أجل غير مسمى

Demand for the Myanmar Urea Fertilizer Project

<مرحلة التخطيط>

2026-08-19 16:28:49

0

0

0

Myanmar has a need to build urea production facilities to promote fertilizer self-sufficiency and support agricultural production. The project relies on local natural gas resources and involves a complete process system for ammonia synthesis, urea synthesis, and granulation. The construction of the facility has high requirements for process technology maturity, energy consumption levels, and flexibility in adapting to local raw material conditions, while also taking into account the engineering construction and logistics supporting environment in the project area. We welcome engineering design and engineering service providers with experience in ammonia-urea plant design, mature process technology, and Southeast Asian project implementation to interface and explore cooperation in project pre-consultation, process scheme validation, engineering design, and subsequent engineering construction, thereby helping to upgrade the local fertilizer industry and enhance agricultural security capabilities.

الأسمدة الكيميائية والكيماويات الزراعية

ميانمار

E - خدمات التصميم الهندسي

C - خدمات الإنشاء والتركيب

ساري إلى أجل غير مسمى

Belarus 30,000-ton soda ash production project

<مرحلة التخطيط>

2026-08-19 16:28:35

0

0

0

Belarus has planned a 30,000-ton per year soda ash production project, targeting the domestic demand of downstream markets such as chemical industry, paper making, and water treatment, with the aim of achieving stable local supply of soda ash products. The project is currently on hold and may be restarted when conditions are ripe. The design institute with performance in the field of small and medium-sized ion membrane soda ash plants is welcome to follow up and track the project, and provide process solutions, plant design, and salt brine supporting planning recommendations. Suppliers of electrolyzers, rectifiers, and chlorine treatment equipment are also welcome to pay attention to the project dynamics and plan potential supply opportunities in advance.

الكلور-قلوي وصناعة الأملاح الكيميائية

بيلاروسيا

E - خدمات التصميم الهندسي

ساري إلى أجل غير مسمى

Diagnostic needs for the Saudi 300,000 tons/year soda ash plant

<مرحلة التخطيط>

2026-08-19 16:28:21

0

0

0

A soda ash plant in Saudi Arabia, with an annual production capacity of 300,000 tons, currently has a production capacity of only about 140,000 tons. The owner hopes to introduce professional forces to conduct a comprehensive diagnosis of the plant, identify production bottlenecks, and propose production upgrading plans. The project has been temporarily suspended, but the owner's need for plant diagnosis and technical upgrades has persisted. Similar needs can be sustained. Engineering companies and expert teams with experience in the operation diagnosis and technical upgrading of large soda ash plants are welcome to pay attention, and can provide process simulation, equipment calculation, bottleneck analysis, and upgrading design services. Suppliers of energy-saving equipment for carbonization and calcination processes are also welcome to explore optimized cooperation.

الكلور-قلوي وصناعة الأملاح الكيميائية

التشغيل والصيانة والخدمات التقنية

السعودية

S - تحديث وتطوير المنشآت

ساري إلى أجل غير مسمى

Demand for the Soda Ash Plant Project in Pakistan

<مرحلة التخطيط>

2026-08-19 16:28:08

0

0

0

Pakistan had planned to build a soda ash production facility to meet the long-term import substitution demand for soda ash raw materials in the glass, detergent, and chemical industries. The project was based on local rock salt and limestone resources and was planned to use the ammonia-alkali process route. The project had conducted preliminary program evaluation and design matching work. At present, the project has been discontinued, but the gap in basic chemical raw materials in Pakistan has persisted, and the investment demand for soda ash and related salt chemical projects is expected to continue to be released, which can be continuously matched. Service providers with large soda ash plant design and engineering experience, familiar with the South Asian market environment, and project implementation models are welcome to pay attention to this platform and can undertake subsequent similar requirements in the areas of project pre-consulting, process scheme, engineering design, and engineering services.

الكلور-قلوي وصناعة الأملاح الكيميائية

باكستان

E - خدمات التصميم الهندسي

C - خدمات الإنشاء والتركيب

ساري إلى أجل غير مسمى
النشر المباشر عبر المنصة

俄罗斯连续式热裂解装置固体残渣连续排出系统优化专家寻访

• انتهى

72

0

本项目为俄罗斯某公司的试验级连续式热裂解装置技术优化需求。项目方目前希望引入具备连续式热裂解装置运行和/或设计经验的工程专家,对装置中固体炭渣/固体残渣连续排出系统运行不稳定的问题进行技术诊断,并提出结构改造及运行优化建议,目标是支持装置实现不少于 72 小时的连续稳定运行。 本次需求的核心问题集中在连续式热裂解过程中干态固体残渣的稳定排出。现有排出系统可能存在粘结、架桥、压实、堵塞、排出区域瓶颈、密封性或气密性不足等问题,需要专家结合设计文件、工艺文件、运行数据及固体残渣样品检测数据进行综合判断,识别导致排出系统不稳定的根本原因。 专家/顾问的主要工作内容包括:审阅试验级连续热裂解装置的设计文件与工艺文件;分析固体残渣样品及检测数据;评估固体残渣连续排出系统的结构、密封、输送及运行逻辑;提出排出单元或系统的结构改造建议;提出运行工况及操作参数优化建议;必要时赴俄罗斯叶卡捷琳堡现场进行设备审计,评估装置在实际运行状态下的技术状况。 最终希望形成书面工程分析报告,内容包括根因分析结论、推荐改造措施、运行工况优化建议、备选方案、可行性评估及初步实施周期。项目可根据实际需要进一步邀请专家支持改造后排出单元的安装、调试和连续运行验证,确认装置达到连续稳定运行不少于 72 小时的目标。 候选专家应具备连续式热裂解装置运行和/或设计相关实操经验,并具有干态固体残渣连续排出系统方面的成熟经验。专家应熟悉机械结构、材料、热工/热力学、粉体或固体输送、高温残渣处理、密封与气密结构、防粘结、防架桥、防压实等相关技术问题。能够通过视频会议高效沟通,并输出清晰的技术报告。 具备英语沟通能力、国际项目经验,或可赴俄罗斯叶卡捷琳堡现场支持 2–4 周者优先。如专业能力突出,英语能力可不作为强制要求。 参考目标专家来源包括但不限于:BESTON GRO

T - خدمات التكنولوجيا وبراءات الاختراع

E - خدمات التصميم الهندسي

S - تحديث وتطوير المنشآت

H - خدمات الكوادر الهندسية

مهمة الطوارئ

Russian Steam Turbine Maintenance Services

• انتهى

1

0

Phase 1 includes procedures for complete disassembly inspection, gas generator support repair, compressor rotor/stator repair, combustion chamber repair, and turbine rotor repair. The work scope covers removing all pipelines from the complete machine and disassembling it down to individual parts, cleaning parts, dimensional tolerance inspection, non-destructive testing (NDT), and issuing a GTD defect list to confirm scrapping criteria with the customer; sequentially processing each stage of the gas generator supports, compressor stationary and rotating parts, combustion chamber, and turbine rotor, replacing damaged blades, seals, fuel injectors, thermocouples and other components, repairing coatings and sealing surfaces, and performing component runout control and dynamic balancing. Phase 2 carries out repair work on the turbine stator, power turbine rotor, and power turbine stator, repairing various sealing clearances, nozzles, blade coatings, replacing damaged components, correcting dynamic balance, and completing all turbine stationary and rotor component repairs. Phase 3 performs engine final assembly, mandatorily replacing all original bearings of the drive box; preparing overhaul execution documents and completion reports and communicating with the customer; completing equipment insulation, nameplate, wiring, and overall protective packaging, and transporting the gas turbine engine to the customer's plant using an air-suspension special vehicle. Phase 4 covers the on-site acceptance testing stage. Within 72 hours after the equipment arrives at the customer site, the complete-machine acceptance test run shall be conducted. The test plan is prepared by the contractor and confirmed by the customer; the repaired gas turbine replaces the original unit and undergoes a continuous 72-hour trial operation. The total duration of all procedures for complete machine replacement, repair, and testing shall not exceed 14 calendar days. After the test, a complete set of execution documents shall be submitted.

S - تحديث وتطوير المنشآت

تتمتع المنصة بإمكانية الوصول إلى أكثر من 1,000 مزوّد خدمة عالي الجودة، مما يساعدك على الربط السريع مع فرق احترافية لحل التحديات في مشاريع الهندسة الكيميائية بكفاءة.
+ نشر المتطلبات الآن
تمت مطابقة أكثر من 1,200 متطلب بنجاح على هذه المنصة.
ابدأ تعاونك الهندسي عبر الحدود هنا
8~16 حرفًا، يجب أن يتضمن أرقامًا وأحرفًا.
ابدأ تعاونك الهندسي عبر الحدود هنا
8~16 حرفًا، يجب أن يتضمن أرقامًا وأحرفًا.
الأسئلة الشائعة关闭
كيف يمكن للمشتري عرض تقدم تنسيق المشروع؟
بعد تسجيل الدخول، يمكنك النقر على الصورة الرمزية في الزاوية اليمنى العليا من الصفحة، ثم في صفحة "المركز الشخصي - سجل المشاريع" يمكنك عرض تقدم جميع مشاريع التواصل وحالة تحديثاتها، والتواصل مع خدمة عملاء المنصة في أي وقت بشأن أمور التواصل في المشاريع.
هل يمكن تعديل معلومات متطلبات المشروع المنشورة لاحقًا؟
يمكنك تعديل الموعد النهائي لمتطلبات المشروع المنشور، ويمكن إجراء هذا التعديل من خلال صفحة "المركز الشخصي -脚印 المشروع - إصداري - متطلبات الخدمات". إذا كانت هناك تغييرات في متطلباتك، يُنصح بتحديث المعلومات في الوقت المناسب لضمان的了解 أحدث الوضع.
كيف تختار الموردين الذين يلبيون احتياجاتك؟ وكيف يمكن دمج ملصقات الفرز معًا لتحقيق مطابقة دقيقة؟
يمكنك استخدام وظيفة التصفية التي يوفرها المنصة للعثور على موردين يلبيون احتياجاتك. في صفحة "ساحة العرض للخدمات - العرض والطلب للخدمات"، يمكنك التصفية حسب العلامات مثل نوع الخدمة، القطاع، الدولة/المنطقة، وقت الاستجابة، وما إلى ذلك. للحصول على تطابق أكثر دقة، يُنصح باستخدام عدة شروط تصفية معًا، حيث تستخدم الشروط الرئيسية (مثل نوع الخدمة، القطاع) لتضييق النطاق أولاً، ثم تستخدم الشروط الثانوية (الدولة/المنطقة، وقت الاستجابة) لمزيد من التحديد الدقيق.
كيف يمكن للمشتري نشر متطلبات المشروع؟ ما هي المعلومات الأساسية التي يجب توضيحها؟
يمكن للمشتري نشر متطلبات المشروع من خلال الخطوات التالية: بعد تسجيل الدخول إلى المنصة، انقر على "عرض وطلب الخدمات"، ثم انتقل إلى "ساحة طلبات الخدمات"، وانقر على زر "نشر طلب"، واملأ تفاصيل الطلب وفقًا للإرشادات الموجودة على الصفحة. تشمل المعلومات التي يجب ملؤها: نوع الخدمة، القطاع الصناعي، الدولة/المنطقة، مرحلة المشروع، المتطلبات المحددة، معلومات الاتصال، وما إلى ذلك. كلما قدمت معلومات أكثر تفصيلاً عن الطلب، زادت احتمالية جذب موردين مناسبين.
ما هي عملية تنسيق المشروع؟
تتضمن عملية تنسيق المشاريع عادةً الخطوات التالية:
1. نشر معلومات متطلبات المشروع أو قدرات العرض؛
2. يقوم النظام بالمطابقة الذكية والتوصية؛
3. إجراء اتصال أولي؛
4. تأكيد نية التعاون؛
5. مفاوضات تفصيلية وجهاً لوجه.
هل تحتاج إلى مساعدة إضافية؟ انقر على ممثل خدمة العملاء، لولو، في الزاوية السفلية اليمنى.
كيفية الإضافة إلى سطح المكتب关闭
关闭